Bridge
Topographical and detailed measured survey of bridge, approach roads
and river to produce detailed drawings of the structure for use by
the clients in house Bridge Engineers in their assessment of the bridge
elements.
Culvert
Blockage
Investigation of reported flooding to houses upstream traced to
partial obstruction of existing culverted watercourse.
Blockage removed by survey team as part of extension to the survey
brief provided by client.
BLACKBURN
COLLEGE
Topographical and internal measured survey carried out for redevelopment
of existing car park and college buildings.
Elevations drawing required for use by Architects in their design
work and planning application procedures with the Local Authority.
CULVERT
Internal structural inspections carried out of culvert beneath Principal
Highway to determine load-bearing capacity of structure.
Inspections carried out by confined spaces survey team fully equipped
with safety equipment to Health & Safety Policy agreed with the
client.
GREEN
TANKS
Mini sewage treatment works designed and installed as part of a water
recirculation scheme to allow re-use of process water within the site
saving up to £8,000 per year.
Design also incorporated sand filter and reed beds to purify the effluent
before being pumped back to the site for process use.
Overall
scheme costs were £178,000 completed in 12 weeks